Tarneit Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Waterproofing inspection in Tarneit

Wet area waterproofing is inspected in the short window after the waterproofer finishes and before the tiler starts. Once tiles are down, membrane coverage cannot be verified.

  • After the waterproofer finishes, before the tiler starts
  • About 1 hour on site
  • Report within 24 hours
Get your Tarneit inspection priceInstant price. No obligation. Same-week bookings.

Fully licensed & accredited

Stage6 of 7
When to bookAfter the waterproofer finishes, before the tiler starts
Time on siteAbout 1 hour on site
Inspected againstAS 3740 (waterproofing of domestic wet areas), AS 3958 (tiling), NCC Volume Two Part 10.2

What is included in a Tarneit waterproofing inspection

  • Membrane coverage across the floor and up the walls
  • Wall upturn heights at the shower and against hobs
  • Hob, threshold and step-down details
  • Bond breakers at wall and floor junctions
  • Floor waste flange bedded and sealed to the membrane
  • Falls to the floor waste and shower screed
  • Penetrations for taps, wastes and shower rails sealed
  • Membrane cure, damage and coverage before tiling
  • Primer and substrate preparation where visible
  • Set-down depth against the finished floor level
  • Junctions to baths, screens and vanities
  • Laundry, powder room and ensuite treated to the same standard
Why it matters here

Waterproofing inspections on Tarneit builds

Shower leaks are one of the most common warranty claims we see on Tarneit homes under five years old. Membranes that stop short of the required upturn, missing bond breakers at the hob, and floor waste flanges not sealed to the membrane are all invisible after tiling and expensive to rectify once the bathroom is finished.

What we find at this stage in Tarneit

  • Membrane upturn below the AS 3740 minimum at shower walls
  • No bond breaker at the hob and wall junction
  • Floor waste flange not sealed to the membrane
  • Falls to the waste not achieved in the screed
  • Membrane damaged or punctured before tiling
Waterproofing membrane damaged and needing repair before tiling starts, Tarneit
Waterproofing membrane damaged and needing repair before tiling starts
Broken roof tiles that will let water into the house, Tarneit
Broken roof tiles that will let water into the house
Sample findings

Sample defects found during our waterproofing inspections in Tarneit

Annotated findings from Waterproofing inspections on Tarneit builds. Client addresses withheld.

Shower screed damaged, so water cannot drain cleanly to the waste, found during a waterproofing inspection in Tarneit
Shower screed damaged, so water cannot drain cleanly to the waste
Waterproof membrane laid with no primer underneath, found during a waterproofing inspection in Tarneit
Waterproof membrane laid with no primer underneath
Lounge window set at the wrong height against the eaves, found during a waterproofing inspection in Tarneit
Lounge window set at the wrong height against the eaves
Bath hob junction not waterproofed the full 40mm each side, found during a waterproofing inspection in Tarneit
Bath hob junction not waterproofed the full 40mm each side
Membrane left unprotected and open to damage before tiling, found during a waterproofing inspection in Tarneit
Membrane left unprotected and open to damage before tiling

The other stages of a Tarneit build

  1. Bored piers inspection in Tarneit1Bored piersAfter the piers are drilled and steel is placed, before concrete
  2. Slab pre-pour inspection in Tarneit2Slab pre-pourThe day before the concrete pour
  3. Frame inspection in Tarneit3FrameAfter roof trusses are on, before wrap, sarking and roof cladding
  4. Lock-up (pre-plaster) inspection in Tarneit4Lock-up (pre-plaster)After brickwork, windows and roof are on, before plasterboard
  5. Fixing inspection in Tarneit5FixingAfter plaster, doors and cabinetry are in, before paint
  6. Pre-handover (PCI) inspection in Tarneit7Pre-handover (PCI)At practical completion, three to five days before the builder's walk-through

All construction stage inspections in Tarneit →

Guides

Construction stage guides for Tarneit

All guides →

Book a waterproofing inspection in Tarneit

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Waterproofing inspections in Tarneit: common questions

What happens if the tiles are already on?

We test with a moisture meter and thermal camera and note what could not be verified. Membrane coverage can only be confirmed before tiling.

Do you flood test the shower?

Flood testing is a separate service. The waterproofing inspection is visual, with measurements of upturn heights and falls.

Is waterproofing part of the fixing inspection?

They used to be booked together, but the waterproofing window closes before fixing work finishes, so we inspect it as its own stage.

CallGet a Free Quote